Call us:
for an instant quote or advice
08458 386 387
for an instant quote or advice
08458 386 387
email your question - we'll reply within 30mins!
info@energistUK.co.uk
don't miss our money-saving offers
click here now

New build, converted or extended commercial premises? You need to submit an SBEM (Simplified Building Energy Model) at the same time as your Building Control Application. At Energist UK our aim is to help you achieve a pass. With a knowledgeable and helpful team, a 72 hour fast track service and 5* customer service – what are you waiting for? Give us a call today!
Energist SBEM Service
|
|
For more information and an INSTANT QUOTATION call us on 08458 386 387 or email info@energistuk.co.uk. Ask us about this month’s special offers.
Download our free SBEM Factsheet here.
Click here to download our SBEM Checklist.
Do I need an SBEM?
From April 2006, all new-build structures for commercial purposes, and some extensions,require an SBEM calculation, in accordance with Part L Regulations.
What does it involve?
The energy efficiency and carbon emissions figures of the proposed building are calculated, based on supplied plans and specification details. There are 2 stages to an SBEM calculation:
Stage 1: ‘design' stage. Your Inspector will require the SBEM report along with your Building Control Application. Without the SBEM report, it is unlikely that your BCO/AI will allow building to commence.
Stage 2: ‘as-built' stage, required when the building is completed. Without a relevant SBEM report, it is unlikely that the building will be released from Building Control.