Get in Touch

(RIBA 0-3)

Planning stage

(RIBA 4-5)

Design & construction

(RIBA 6-7)

Completion & post-completion

Our esg offering

Do you know how to prepare for the implementation of The Future Homes Standard? Our snapshot guide will tell you exactly how
AdobeStock_250163907-scaled-1
8 Minute Read • Design & Construction (RIBA 4-5)

Options for Thermal Bridging

Categories
Design & Construction (RIBA 4-5) Part L/Section 6
Design & Construction (RIBA 4-5)

Options for Thermal Bridging

Architects know that a well-insulated dwelling is key to achieving low emission rates on new build developments. High specification windows and thick quantities of insulation in the walls, floors and roofs means less heat can escape from the building, reducing energy demand and lowering fuel bills.

Taking consideration of heat loss through Thermal Bridging is just as important, but this is often overlooked by designers.

This is where heat from a building escapes through corners and joints; Wherever there’s a break in the insulation layer, you’ll find a thermal bridge.

The majority of smaller housebuilders in the country follow a guidance manual called Accredited Construction Details (ACD). This is a standardised set of best practice building techniques to reduce heat loss through a building’s thermal breaks.

But ACDs were drawn up twenty years ago, and building techniques have moved on.

When Approved Document Part L changes next year, the option to use ACDs in SAP calculations is being removed. This means that, from next year, designers will need to find alternative ways of limiting heat loss through the thermal bridges in their developments.

So, what are the alternatives?

Option 1 is ignore them, but that’s not going to be viable. A dwelling that needs to comply with the new energy and emission targets won’t get anywhere near compliance if default thermal bridging assumptions are used.

Option 2 is to use Government Approved Details. This is a new online library of junctions which is being created by the Building Research Establishment (BRE). Just like the old ACD library, the junctions are standardised and free for anyone to use. We expect most smaller housebuilders will take this option because it’s free, although the improvements in SAP won’t be anything special.

Option 3 is to use manufacturer supplied data. Many insulation, lintel and balcony providers have produced their own thermal bridging calculations specific to their products. If your company buys products directly from the manufacturer, ask if they have psi-value or thermal bridging calculations available. This approach usually gives a boost to the performance of SAP calculations.

Finally, option 4 is go bespoke. Larger housebuilders already take this approach, and we’re expecting many more construction companies to follow when the targets change. Once a developer has commissioned their own psi-value calculations, the same results can be used on all future construction sites, providing their specification doesn’t change. The initial cost of the calculations makes sense when you can show improvements on hundreds of SAP results for years to come.

Reducing heat loss through Thermal Bridging will be an essential puzzle piece when complying with the Future Homes Standard targets. But it’s not the only puzzle piece, and high efficiency standards will be required across the specification to meet overall compliance.

For more information about thermal bridging bespoke psi-values, SAP10 and the new Part L targets, contact Energist today.

You may also be interested in...

Copy-of-Copy-of-Energist-Services-wheel-June2023-v2.2-1.pdf-4.png?w=1024&h=724&scale

Which energy and sustainability services do I need to comply with building regulations?

What-is-SBEM

What is SBEM?

AdobeStock_208895958-scaled-1.jpeg?w=1024&h=683&scale

SBEM – Compliance with new regulations

AdobeStock_120308203-scaled-1.jpeg?w=1024&h=683&scale

AD-O Overheating

AdobeStock_58102489-scaled-1.jpeg?w=1024&h=684&scale

SAP 10.2 walks into a bar… nobody looks up

AdobeStock_189365703-scaled-1.jpeg?w=1024&h=609&scale

The wave of change – the next five years

    Got a question on an upcoming project?

    We can help! If you want to run something past us, ask that question you can’t find the answer to on google or maybe have a specific project in mind, then we can help. Fill in the below and we’ll be back in touch!

    Exit intent form